Environmental

Solar Rooftop Project

Sikarin Public Company Limited implemented a Solar Rooftop project to increase the proportion of renewable energy use, reduce dependence on electricity generated from fossil fuels, and support long-term greenhouse gas emissions reduction. Installation and system operation began in 2024 and continued into 2025, covering both Sikarin Hospital (On-grid installed capacity of 105.5 kWp) and Medova Premium Lifestyle (On-grid installed capacity of 54.5 kWp). The performance results reflect that, in 2025, Sikarin Hospital’s Solar Rooftop system generated 147.96 MWh of electricity and reduced greenhouse gas emissions by 70.28 tCO2e, while Medova Premium Lifestyle generated 49.04 MWh of electricity and reduced emissions by 24.47 tCO2e.

In addition, in 2025, Sikarin Public Company Limited received the MEA ENERGY AWARDS at the Standard level (Hospital Building Category) under the building energy efficiency improvement promotion project, which supports the enhancement of systematic and sustainable energy management alongside the quality of medical services.